Sand Management & Control

PRD052

Course Description

Integrated Sand Management is essential to safe operation of oil and gas fields. In addition, an integrated approach to sand management will deliver better productivity of the wells, minimize costs and ensure safe and steady operations of the wells and facilities. Sand management is concerned with sand, proppant and other associated solids from oil and gas wells. In the past, the standard approach was to install downhole sand control to stop sand from coming to surface. However, this has led to lower production from wells and higher well completion costs.
Nowadays, a holistic approach is required where the pros and cons of downhole sand control need to be balanced with managing safe levels of sand production to surface. Typically, this approach leads to significantly higher production and lower costs, while maintaining the safety and integrity of the wells and facilities. This informant and intensive training course will address how sand can be managed downhole, at surface or with a combination of the two. We look how you can develop a sand management strategy and plan, which will give the optimum result for your field.
This training course will highlight:

  • What is Integrated Sand Management
  • Basic design & operation considerations for sand control completions
  • How to select the preferred downhole sand control technique
  • Surface sand management options
  • Sand management strategy and plan

Course Goal

To enhance the participants’ knowledge, skills, and abilities necessary for managing and controlling sand downhole and at surface.
 

Course Objectives

By the end of this training course, participants will learn to:

  • Explain what Integrated Sand Management is.
  • Describe basic design & operation considerations for both cased and open hole sand control completions
  • Prepare a decision tree to select the preferred sand control technique
  • Describe surface sand management options
  • Explain how to prepare a sand management strategy and plan

Who Can Benefit

  • Petroleum engineers.
  • Process engineers.
Location
Cairo
Start Date End Date
03-Sep-2023 07-Sep-2023

Location
Dubai
Start Date End Date
03-Dec-2023 07-Dec-2023

Location
Cairo.
Start Date End Date
10-Mar-2024 14-Mar-2024

Location
Dubai.
Start Date End Date
09-Jun-2024 13-Jun-2024

English - Course Details
PRD052 - Sand Management & Control